


While the windows are still being delayed by city problems, the roof is dried in and the framer is almost done inside. The plumber is doing the rough-in work and the A/C contractor is starting. Once everyone is roughed in, a framing inspection will get us ready for sheetrock.
0 Comments:
Post a Comment
<< Home