At long last the stairs are being assembled to check for fit while the drawings are still being worked on. As shown, the glass bolt holes are incorrectly placed and we are working with the vendor to replace them.
The final coats of paint are being applied, also the very important framing inspection was passed successfully. The insulation has been applied, inspected and approved. By Monday the drywall will be started.
While the window inspection issues are being resolved, the exterior is waterproofed and the painting is started. The three colors will be put on in two coats
All the stucco is done and the building is ready for exterior paint. The rough trade inspections are done and as soon as the window, truss and framing inspections can be completed the drywall will start inside. The stairs have arrived but are waiting for drawings.