Tuesday, August 08, 2006

The Stucco is done



All the stucco is done and the building is ready for exterior paint. The rough trade inspections are done and as soon as the window, truss and framing inspections can be completed the drywall will start inside. The stairs have arrived but are waiting for drawings.